Project Name: - CRAFT, Aberystwyth
Project Value: - £2,200,000.00
Duration: - 16 months
Date Completed: - April 2006
Client: - CRAFT (Ceredigion Recycling And Furniture Trust)
Contractor: - J. Harper & Sons (Leominster) Ltd
Architect: - James Jenkins
Quantity Surveyor: - Bowen Consultants Ltd
CDM Coordinator: - Bowen Consultants Ltd
Structural Consultant: - Bingham Rawlings Partnership
M & E Consultant: - Howard Doolan Associates
Brief Description: - The site is located at the Station Yard/Disused Platform, Aberystwyth Railway Station. The works consisted of the refurbishment/alterations of the existing railway building/platform together with the construction of a steel framed two storey workshop building on the adjacent site. The buildings ethos is one of recyclability and sustainability.
01686 625455
01686 625477
©2007 Bowen Consultants Limited. All Rights Reserved.
Site designed and built by Cyberium